Installation

Installation

Installation – Asphalt

Installing a Ped-Zone™ sign is very easy. Simply drill four holes (Diameter: ¾ inch, Depth: 4 inches), pour in Bitu-Link™ epoxy, insert anchors and wait 24 hours until the epoxy has hardened. The sign is then fastened with four bolts. This fastening method, which is perfectly suited for asphalt pavement, allows for the signs to be removed each fall, leaving the anchors for the next season.

Installation – Concrete

Installing a Ped-Zone™ sign in concrete is very easy. Simply drill four holes (Diameter: ½ inch, Depth: 1 3/4 inch), insert drop-in anchors and hammer them with a punch. The sign is then fastened with four bolts. This fastening method, which is perfectly suited for concrete allows for the signs to be removed each fall (if needed), leaving the anchors for the next season.